2020 Master Suite – Part 1b

The Plan:

  1. Plasterboard the ceiling
  2. Level and install new green chipboard to the en-suite
  3. Build the wall with door for the en-suite
  4. Install the plumbing and electrics.
  5. Level and replace the chipboard in the bedroom area
  6. Build the insulated walls around the bedroom from the bottom of the sloping ceilings to the new floor.
  7. Tile and decorate!

 

Still on part 1 – the job of taping, jointing and painting the ceiling. This made for a good new years trip 🙂

 

 

So part 1 is done!