2020 Master Suite – Part 1b
The Plan:
- Plasterboard the ceiling
- Level and install new green chipboard to the en-suite
- Build the wall with door for the en-suite
- Install the plumbing and electrics.
- Level and replace the chipboard in the bedroom area
- Build the insulated walls around the bedroom from the bottom of the sloping ceilings to the new floor.
- Tile and decorate!
Still on part 1 – the job of taping, jointing and painting the ceiling. This made for a good new years trip 🙂
So part 1 is done!